LFH Drydock (continued 3)

21/07/2010 § Leave a comment

Starboard side of extension nearly done. All bottom plates are welded, next step full welding of secondary frames and bulkheads. Then side plates and finally top plates.

The port side is advancing fine, back secondary frames soon in position. Bottom plates on-going.

In the next few weeks the full extension will be finished. LFH is planned to slide down from her slipway in 3 weeks (finger crossed).